Case Studies
CASE STUDY 2 DOD
31 years on
THE PCI LINE THAT WON’T QUIT
0.5
PCI / YEAR DECLINE
Untreated
peer pavements
deteriorated at
2.3 PCI / year
This high-altitude military testing runway — built in 1995, maintained only with FAA P-608 (UFGS 32 01 13.63) — has held the line for three decades.